RFQ Checklist

Rain Bird RFQ checklist: compact fields for agri irrigation procurement

Capture crop, irrigated hectares, inlet pressure, controller stations and delivery window before Rain Bird prices rotors, drip tape or valves. Missing one of those fields usually costs a clarification round.

This page is a procurement worksheet, not a sustainability statement. Fill the structured table, tick the readiness list, then send the brief so the desk can answer with station maps and parts kits instead of a catalogue dump.

Structured RFQ data

Fields the irrigation desk needs on the first message

Field Why it matters Example value
Crop / production system Steers drip vs rotor and fertigation hygiene rules Corn under drip tape / apple orchard micro
Irrigated area Sizes laterals, valves and pump duty 40 ha (or acre equivalent)
Inlet pressure & flow Validates nozzle charts and VFD pump setpoints 3.5 bar / 45 m³/h available
Controller stations Locks 6 / 12 / 24 maps and sensor inputs 12 stations + flow sensor
Geometry constraint Flags drip vs center pivot labour trade-off Rectangular block, no pivot spans
Delivery window Aligns stock vs build-to-order parts Before 15 March planting

Readiness checklist

Tick these before you hit send

  • Crop type and whether the water contacts edible produce (GLOBALG.A.P. notes if needed)
  • Irrigated hectares or acres for the block in this RFQ only
  • Measured or design inlet pressure in bar and available flow in m³/h
  • Preferred family: drip tape, rotor/spray, valves, or controller-only
  • Station count and any rain / flow / soil-moisture sensor inputs
  • Fertigation injector requirement and filtration class already on site
  • Latest acceptable delivery date relative to planting or bloom prune
  • CE / ISO documentation pack requested for export shipments

If your block is already locked to center pivot geometry, say so explicitly. Rain Bird can still quote valves, end-gun interfaces and controller logic, but we will not invent drip laterals that fight an installed pivot span. Likewise, greenhouse RFQs should note whether fertigation injectors sit after filtration today; relocating injectors mid-quote changes both valves and sampling taps.

Dealers may attach last season nozzle charts or a photo of the valve box. Those extras speed the reply, yet they never replace the six core fields in the table above. When acreage, pressure and station count are present, most stock SKUs receive a first answer inside the stated 48-hour parts window.

Verification path before PO: request the January 2026 rotor nozzle chart (pressure vs radius), a blank station-map worksheet, and — where the crop justifies it — a short emitter-flow bench note for the proposed drip tape spacing. Applications can walk the numbers on a 30-minute call using your inlet bar and 45 m³/h planning flow; no catalogue dump substitutes for that check.

Submit the irrigation brief

Use the contact desk form with the fields above filled. The team returns a shortlist and a parts kit list, not a generic catalogue dump.

Send RFQ to Rain Bird