About Rain Bird

Rain Bird irrigation engineering measured in flow, pressure and station maps

Rain Bird builds controllers, valves, rotors and drip systems for growers who already know their crop, acreage and delivery window. We publish nozzle charts and field-trial notes so procurement can verify precipitation rates before purchase orders leave the farm office.

Clear requirements beat glossy catalogues. When a brief states 40 ha under drip tape, 3.5 bar inlet and twelve stations, the shortlist collapses to hardware that can hold those numbers through peak summer demand.

Rain Bird applications desk — irrigation RFQ review note, Q1 2026

Since 1933 Rain Bird has stayed inside irrigation and water management rather than adjacent farm machinery. That boundary matters: an RFQ expects crop geometry, emitter or nozzle class, and utility data, not tractor horsepower or harvest moisture targets.

In 2018 the company expanded outdoor plot protocols for drip tape emitter spacing against soil intake curves; in 2024 the controller station-map worksheets were standardized for 6 / 12 / 24 zone briefs. Applications engineers still review those maps against available VFD pump duty so the far lateral holds design pressure during fertigation pulses.

Field labs & facilities

Where nozzle charts and fertigation sequences get stress-tested

Lab bays measure throw radius, precipitation uniformity and valve response time. Outdoor plots compare drip tape emitter spacing against soil intake curves for corn, orchard and greenhouse beds.

Nozzle chart test bay with rotor heads Drip tape emitter flow benches Controller station wiring training board Outdoor irrigation field trial plot

Technical notes

Documents buyers request before locking an RFQ

  • Rotor nozzle chart — pressure vs radius

    Tables for 2.0–4.5 bar operating bands with precipitation-rate notes for sandy and loam soils. Chart revision dated January 2026 for the current nozzle family.

    PDF pack
  • Drip vs center pivot selection memo

    Side-by-side water-use and labour notes for rectangular blocks versus circular pivot geometry.

    Tech brief
  • Fertigation injector placement checklist

    Filtration order, sampling taps and flush sequences used during greenhouse and row-crop start-up.

    Checklist
  • Controller station map template

    Blank 6 / 12 / 24 station worksheets with sensor input columns for rain and flow switches.

    Worksheet

Need the engineering pack with your quote?

Ask the desk to attach nozzle charts and station templates when you submit crop, hectares and delivery week.

Contact Rain Bird